CRMB 55 Bitumen Specification

Last updated: 2026-09-29

CRMB 55 is a crumb rubber–modified bitumen grade produced by blending 55% crumb rubber content (by weight of the rubber modifier masterbatch) into penetration-grade bitumen, typically VG-30 or VG-40. The resulting binder delivers a penetration value of 50–70 dmm at 25°C, a softening point of 50–65°C, and elastic recovery above 60%, making it suitable for hot-mix asphalt in high-traffic and high-temperature regions. Standard pricing for CRMB 55 in bulk export quantities (20–28 MT ISO tank or drummed loads) ranges from $520–$680 per metric ton FOB India depending on crude feedstock and order volume.

What Is CRMB 55? Definition and Composition

CRMB 55 (Crumb Rubber Modified Bitumen, grade 55) is a polymer-modified bitumen where the modifier is waste tyre crumb rubber rather than virgin SBS polymer. The "55" designation refers to the formulation standard — in Indian Standard IS 15462, CRMB grades are labeled by their crumb rubber content and performance class (CRMB 50, CRMB 55, CRMB 60). CRMB 55 uses a higher rubber dosage than CRMB 50, which raises viscosity, elasticity, and rutting resistance.

Key composition components:

  • Base bitumen: VG-30 or VG-40 penetration grade (85–90% of final blend by weight)
  • Crumb rubber modifier: 40–60 mesh cryogenic or ambient-ground tyre rubber (10–15% by weight of base bitumen)
  • Compatibilizer/aromatic oil: 1.5–3% to stabilize the rubber-bitumen interface
  • Stabilizing agent: 0.1–0.3% sulfur or cross-linking additive

The crumb rubber swells and partially devulcanizes during high-shear mixing at 180–195°C for 45–90 minutes, creating a three-dimensional network that absorbs lighter bitumen fractions and stiffens the binder.

PropertyCRMB 55 (IS 15462)VG-30 (IS 73)SBS PMB 40
Penetration @ 25°C (dmm)50–7045–7040–60
Softening point (°C)50–6547–5560–75
Elastic recovery (%)≥ 60N/A≥ 75
Viscosity @ 150°C (Pa·s)1.5–3.00.4–0.81.2–2.5
Flash point (°C)≥ 220≥ 220≥ 220
Solubility in TCE (%)≥ 97≥ 99≥ 98

CRMB 55 Performance Data and Test Specifications

CRMB 55 is engineered for pavements carrying over 30 million standard axles (MSA) and operating in climates with pavement temperatures reaching 50–60°C. Its elastic recovery is the primary differentiator — it rebounds from deformation rather than flowing permanently.

Comparative test data (typical values across 5 production lots):

Test ParameterTest MethodMinMaxTypical
Penetration @ 25°CIS 1203507058
Softening pointIS 1205506557
Ductility @ 27°C (cm)IS 120850—68
Elastic recoveryIS 15462 App. B60—72
Thin film oven test (TFOT) lossIS 9382—1.0%0.6%
Penetration ratio after TFOT—60—71
Specific gravityIS 12021.011.061.03

Performance benchmarks vs. base VG-30:

  • Rutting resistance at 60°C: 35–50% improvement in dynamic creep
  • Fatigue life: 2–3× longer under repeated loading
  • Moisture susceptibility (TSR): 85–92% vs. 75–80% for VG-30
  • Service life extension: 4–7 additional years on high-traffic corridors

These numbers explain why CRMB 55 is specified on expressway projects in India, Southeast Asia, and parts of Africa and the Middle East.

CRMB 55 vs CRMB 50 vs CRMB 60: Grade Comparison

Grade selection depends on traffic load and climate. Below is a direct comparison.

ParameterCRMB 50CRMB 55CRMB 60
Crumb rubber content~50 mesh equivalent55 formulation~60 formulation
Softening point (°C)47–6050–6555–70
Elastic recovery (%)≥ 50≥ 60≥ 70
Typical useModerate trafficHeavy traffic, highwaysExtreme traffic, airports
Viscosity @ 150°C (Pa·s)1.2–2.21.5–3.02.0–4.0
Mixing temp (°C)160–170165–175170–180
Approx. price FOB ($/MT)480–600520–680580–740
Recommended MSA< 2020–50> 50

Selection logic:

  • Under 20 MSA, mild climate → CRMB 50 is cost-efficient
  • 20–50 MSA, hot climate → CRMB 55 is the standard specification
  • Over 50 MSA, airports, container yards → CRMB 60

CRMB 55 occupies the sweet spot: it meets most national highway specifications while costing 8–12% less than CRMB 60 for nearly equivalent performance in most field conditions.

CRMB 55 Application, Mixing, and Storage

Applications:

  • National highway wearing courses (BC/SDBC)
  • Expressway overlays
  • Urban arterial roads with heavy bus traffic
  • Bridge deck waterproofing
  • Airport taxiways (where CRMB 60 is not mandated)

Mixing parameters:

StageTemperatureDuration
Crumb rubber–bitumen blending180–195°C45–90 min
Hot mix plant discharge165–175°C—
Laydown≥ 150°C—
Initial rolling140–150°C—
Storage (with agitation)150–165°Cmax 8 hours
Storage (static, no agitation)avoid > 4 hoursrisk of settlement

Storage and handling rules:

  • CRMB 55 separates if stored static — agitation every 2–4 hours is mandatory
  • Do not exceed 175°C during storage to prevent rubber degradation
  • Tank heating coils should maintain 150–165°C steady state
  • Consume within 72 hours of production for peak performance
  • Transport in insulated ISO tanks with 20–28 MT capacity

Logistics reference:

ModeTypical VolumeLead Time (India → SE Asia)
ISO tank20–24 MT12–18 days
Drummed (new steel drums)180–200 kg/drum15–22 days
Flexitank22–24 MT14–20 days
Bulk vessel parcel500–5,000 MT18–30 days

Pricing, Market Trends, and Procurement

CRMB 55 pricing tracks three inputs: base bitumen (VG-30/40) cost, crumb rubber cost, and freight. Base bitumen is roughly 80–85% of the final price, so crude oil movements dominate.

Indicative price bands (FOB India, 2024–2025):

QuantityPackagingPrice Range ($/MT)
20–50 MTISO tank/drums560–680
50–200 MTISO tank540–640
200–1,000 MTFlexitank/vessel520–600
1,000+ MTBulk parcel500–580

Market drivers to monitor:

  • Crude oil (Brent): every $10/bbl move shifts base bitumen by roughly $35–50/MT
  • Crumb rubber supply: tyre recycling rates in India, China, and EU affect modifier cost
  • Freight rates: container and tanker rates can swing delivered cost by 8–15%
  • Specification drift: more agencies adopting CRMB 55 over CRMB 50 has raised demand 10–15% year over year

Procurement checklist:

  • Request batch-wise test certificates (penetration, softening point, elastic recovery)
  • Verify IS 15462 or equivalent (ASTM D6114 for polymer-modified blends) compliance
  • Confirm agitation-equipped storage at destination port
  • Lock pricing on base + modifier + freight separately to hedge crude volatility
  • Inspect drum/tank seals and check for settlement before unloading

For buyers running cost models across multiple shipments, use the [6Tar cost calculator](https://6tar.com/cost-calculator) to compare FOB, CIF, and landed cost scenarios instantly.

FAQ: CRMB 55 Bitumen

What does "55" mean in CRMB 55?

The "55" refers to the formulation grade under IS 15462, indicating a crumb rubber content and performance class higher than CRMB 50 and below CRMB 60. It is defined by properties like a 50–70 dmm penetration and ≥ 60% elastic recovery, not a literal 55% rubber content.

What is the price of CRMB 55 per metric ton?

CRMB 55 typically sells for $520–$680 per metric ton FOB India depending on order volume, packaging, and crude feedstock timing. Bulk parcels above 1,000 MT can price as low as $500/MT, while small drummed orders run $650–$680/MT.

How does CRMB 55 differ from CRMB 50?

CRMB 55 has a higher softening point (50–65°C vs 47–60°C) and elastic recovery (≥ 60% vs ≥ 50%), giving better rutting resistance. It is specified for 20–50 MSA traffic, whereas CRMB 50 suits under 20 MSA.

Can CRMB 55 be stored without agitation?

No — CRMB 55 will settle and separate if left static for more than 4 hours. Storage tanks must be agitated every 2–4 hours and held at 150–165°C, with consumption ideally within 72 hours of production.

What is the minimum order quantity for CRMB 55 export?

Most exporters ship CRMB 55 starting at a 20 MT ISO tank or a 20-foot container of drums (about 18–20 MT). Flexitank and bulk vessel options begin at 22 MT and 500 MT respectively.

Ready to model your delivered cost? Compare FOB, CIF, and inland logistics for CRMB 55 in under 60 seconds with the [6Tar cost calculator](https://6tar.com/cost-calculator) — built for bitumen traders who need accurate numbers before the quote goes out.

Advertisement