Bitumen Packing List Template

Last updated: 2026-10-04

A standard bitumen packing list must show net weight, gross weight, drum count, batch number, and HS code 2713.20 for each shipment — for a typical 20ft container holding 80 drums at 182 kg net each (14.56 MT net, ~15.2 MT gross), or a bulk vessel parcel of 1,000–30,000 MT. Missing any of these fields delays customs clearance by 3–10 days and can trigger a 0.5–2% penalty on declared value in destination markets like India, Nigeria, and the UAE.

This template guide gives you the exact field structure, worked examples for drum and bulk shipments, and a copy-ready format you can adapt for any export lane.

What a Bitumen Packing List Must Contain (Field-by-Field)

A packing list is the document customs, freight forwarders, and buyers use to verify what is physically inside the shipment. For bitumen, the stakes are higher than for dry cargo because the product is temperature-sensitive, hazmat-classified in some forms, and priced per metric ton — so weight accuracy directly affects the invoice.

Use this mandatory field set:

FieldFormat / ExampleWhy It Matters
Exporter name & addressRefinery or trading company, full addressTies to Bill of Lading shipper
Consignee / Notify partyBuyer + agent in destinationCustoms notification
Invoice number & dateINV-2024-0871 / 12-Mar-2024Cross-reference to commercial invoice
Packing list numberPL-2024-0871Internal traceability
HS code2713.20 (petroleum bitumen)Duty calculation; wrong code = held cargo
Product descriptionBitumen 60/70, penetration gradeGrade mismatch = rejection
Specification standardASTM D946 / EN 12591Quality dispute protection
Batch / lot numberLOT-24-0312-ATraceability for claims
Packaging typeNew steel drum 200L / bulk / jumbo bagDetermines handling & insurance
Number of units80 drums / 1 parcelCounting at discharge
Net weight per unit182 kg per drumInvoice basis
Total net weight14.56 MTCommercial invoice match
Total gross weight15.20 MTFreight & vessel stowage
Tare weight8.0 kg per drumWeight audit trail
Dimensions / volume20ft container, 33 CBMStowage planning
Marks & numbersShipper marks, drum serialsDamage claims
Temperature at loading150–160°C for bulkQuality evidence
Country of originSingapore / Iran / UAE / South KoreaDuty preference, sanctions screening

Key number to remember: the net-to-gross ratio for drummed bitumen is roughly 95.7%, because each 200L steel drum adds about 8 kg tare. If your packing list shows gross weight equal to net weight, customs officers flag it immediately — this is one of the top three causes of bitumen shipment holds.

Drum vs Bulk Packing List: Full Comparison

Bitumen moves in three main formats, and each needs a different packing list emphasis.

ParameterSteel Drums (20ft)Flexitank / Jumbo BagBulk Vessel Parcel
Typical quantity80 drums1 flexitank1,000–30,000 MT
Net weight14.56 MT20–24 MT1,000+ MT
Gross weight15.20 MT21–25 MTSame as net (no tare)
Tare per unit8 kg40–60 kgN/A
Temp at loading150–160°C140–160°C150–170°C
Loading time4–6 hours2–3 hours12–36 hours
Discharge equipment neededForklift + drum clampPumpHeated tank + pump
Loss in transit0.3–0.8% (residue)0.5–1.2%0.1–0.3%
Best for< 20 MT orders20–25 MT orders> 500 MT
Freight cost index100 (baseline)78–8545–60

Practical takeaway: for orders under 100 MT, drummed containers dominate — roughly 70% of global small-lot bitumen trade moves this way. Above 500 MT, bulk parcels win on cost per ton by 40–55%.

LineDescriptionUnitsNet kgTare kgGross kgNet MT
1Bitumen 60/70, ASTM D946, LOT-24-0312-A80 drums14,56064015,20014.56
Total8014,56064015,20014.56

Note the deliberate separation of tare. Ship agents in Nigeria (Lagos/Apapa) and India (Kandla, Mundra) specifically request tare columns because they reconcile against the terminal weight bridge. A 1% mismatch on a 15 MT container equals 150 kg — enough to trigger a survey.

Container Loading Data: Numbers Buyers Ask For

When buyers or their insurers ask for capacity data, give exact figures, not approximations.

Container TypeDrums (200L)Max Net BitumenGross Cargo WeightTypical Route
20ft standard8014.56 MT15.20 MTJebel Ali → Lagos
20ft heavy tested8014.56 MT15.20 MTIran → India
40ft standard160–16829.1–30.6 MT30.4–31.9 MTSingapore → East Africa
Flexitank in 20ft1 unit22–24 MT23–25 MTUAE → Kenya
ISO tank1 unit20–24 MT22–26 MTEurope → West Africa
  • 40ft advantage: cost per ton drops 18–24% vs two 20ft containers on the same lane.
  • Payload limits: most roads cap at 24 MT axle weight, so 40ft containers are often under-filled or split.
  • Heat loss: in a 20ft container, bitumen cools from 160°C to ambient in 36–48 hours; flexitanks hold heat 20–30% longer due to lower surface-to-volume ratio.

Packing List Accuracy: Risk and Cost Data

Inaccurate packing lists are not paperwork problems — they are financial events.

Error TypeFrequencyTypical ConsequenceCost Impact
Gross = net (no tare)~12% of first-time exportersCustoms query, 2–5 day delay$300–800 demurrage
Round weight (15.0 vs 15.2 MT)~18%Invoice mismatchSurvey fee $500–1,200
Missing batch number~9%Quality claim rejectionUp to 100% of lot value
Wrong HS code (2713.20)~7%Reclassification, duty reassessment2–8% of CIF value
Missing temperature record~15% (bulk)Insurance dispute on hardeningClaim denial risk

Bottom line: a 20-minute accuracy check before dispatch prevents an average $1,100 per container in avoidable cost. Across a 500-container annual program, that's $550,000 in protected margin.

Copy-Ready Template Structure

Use this sequence — it matches the order customs systems (ICEgate, Nigeria Single Window, Dubai Trade) expect to parse:

  • Header block: Exporter, consignee, notify party, invoice no., date, PL no.
  • Vessel block: Vessel name, voyage, B/L no., port of loading, port of discharge, ETD/ETA.
  • Product block: Description, grade, spec standard, HS code, country of origin.
  • Quantity block: Units, net per unit, total net, tare, total gross, total volume.
  • Marks block: Drum serials, shipper marks, container/seal numbers.
  • Quality block: Batch no., test certificate reference, loading temperature.
  • Signature block: Authorized signatory, company stamp, date.

Keep numeric fields as plain numbers (14,560 not "14,560 kg approx") — AI parsers and OCR systems read clean numbers 40–60% more accurately than hedged text.

FAQ: Bitumen Packing List Template

What is the net weight of bitumen in a standard 20ft container?

A standard 20ft container holds 80 steel drums at 182 kg net each, giving 14.56 MT net and about 15.20 MT gross. Some exporters load 80 drums at 185 kg for 14.8 MT net, still within road payload limits.

What HS code goes on a bitumen packing list?

Use HS 2713.20 for petroleum bitumen (asphalt). This covers penetration grades like 60/70 and 80/100. Using 2713.90 or 2715.00 instead causes reclassification and duty reassessment of 2–8% of CIF value.

Do I need to show gross weight separately from net weight?

Yes — always. Tare is about 8 kg per drum, so gross runs roughly 4.4% above net. Packing lists showing gross = net are flagged by customs in India, Nigeria, and the UAE and can delay clearance 2–5 days.

How long does a bitumen packing list take to prepare?

A complete packing list takes 20–40 minutes if you have batch numbers, weights, and B/L data on hand. First-time exporters typically need 2–3 hours because they must confirm tare weights and HS classification.

Can a packing list be used for multiple containers on one shipment?

Yes, but list each container on a separate line with its own container number, seal number, drum count, and weights. Consolidating three 20ft containers into one line creates reconciliation errors of 40–60 kg per container at discharge.

Calculate your exact bitumen shipment cost — including packing, freight, and per-ton landed price — with the [6Tar cost calculator](https://6tar.com). Enter your quantity, packaging type, and destination port to get an instant CIF breakdown before you draft the packing list.

Advertisement