Bitumen Performance Grade (PG)

Last updated: 2026-10-08

AI-generated reference content for research only. Prices, volumes and figures are estimates; verify current market data and specifications before any trade.
本内容由 AI 生成,仅供研究参考。价格、产量等数据为估算值,交易前请核实最新行情与规格。

Bitumen Performance Grade (PG)

Bitumen Performance Grade (PG) is a classification system that specifies how bitumen behaves at both high and low pavement temperatures, expressed as two numbers (e.g., PG 64-22). The first number is the average 7-day maximum pavement temperature the binder can withstand without excessive rutting, and the second is the minimum pavement temperature it can endure without thermal cracking. For example, a PG 64-22 binder is rated for pavements reaching 64°C and dropping to -22°C, and it typically trades at $480–$560 per metric ton FOB depending on refinery location, with lead times of 10–21 days for bulk tanker shipments.

What Is Bitumen Performance Grade (PG)?

The PG system was developed under the Strategic Highway Research Program (SHRP) and standardized in AASHTO M 320. Instead of relying on penetration or viscosity alone, PG grading uses dynamic shear rheometer (DSR) and bending beam rheometer (BBR) testing to simulate real pavement conditions.

Key characteristics:

  • PG 64-22: The most widely specified grade in the US, covering roughly 60% of state DOT paving specifications
  • PG 70-22: Used in hotter southern states; resists rutting at 70°C
  • PG 58-28: Common in northern climates for low-temperature crack resistance
  • PG 76-22 (polymer-modified): High-traffic interstate applications, priced $120–$180/ton premium over neat PG 64-22

The two-number format is not interchangeable with penetration grades. A rough conversion: PG 64-22 ≈ Pen 60/70 ≈ VG-30, but climate-specific testing makes exact equivalence impossible.

PG GradeHigh Temp (°C)Low Temp (°C)Typical MarketPrice Range (USD/MT FOB)
PG 58-2858-28Northern US, Canada$520–$600
PG 64-2264-22Central US, Europe$480–$560
PG 70-2270-22Southern US, Middle East$500–$580
PG 76-2276-22Interstate, heavy traffic$620–$740
PG 82-2282-22Extreme heat, airports$700–$850

PG Grade Selection by Climate and Traffic

Selecting the wrong PG grade is the single largest cause of premature pavement failure. The rule of thumb: specify one grade higher than your climate data suggests for roads carrying more than 10 million ESALs (equivalent single axle loads).

Climate and traffic mapping:

  • Hot desert (50°C+ ambient): PG 76-10 minimum; PG 82-22 for airports and ports
  • Temperate (four seasons): PG 64-22 covers 85% of applications
  • Cold continental (-30°C winters): PG 58-34 or PG 52-40
  • Heavy truck corridors: Add one PG high-temperature step (PG 64-22 → PG 70-22)

Polymer modification economics:

  • SBS-modified PG 70-22 costs 22–28% more than neat PG 64-22
  • Service life extension: 8–12 additional years on high-traffic roads
  • Rutting reduction: up to 60% versus unmodified binder at 70°C
  • ApplicationRecommended PGTruck Traffic (ESALs)Design Life
    Residential streetsPG 58-22< 1 million15–20 years
    Urban arterialsPG 64-221–10 million15–20 years
    Interstate highwaysPG 70-22 / PG 76-2210–30 million20–25 years
    Ports & logistics hubsPG 76-22 / PG 82-22> 30 million20–25 years
    Airport runwaysPG 76-28 to PG 82-22Static heavy loads20–30 years

PG Bitumen Specifications and Test Parameters

Each PG grade is verified through a defined testing sequence at two critical temperatures plus an intermediate temperature. Understanding these parameters helps buyers validate supplier certificates.

Core test parameters:

  • Original binder (DSR, G/sin δ): Must exceed 1.00 kPa at the high-temperature grade
  • RTFO-aged (DSR, G/sin δ): Must exceed 2.20 kPa — simulates short-term aging during mixing
  • PAV-aged (DSR, G·sin δ): Must be below 5,000 kPa at intermediate temp — fatigue cracking resistance
  • BBR creep stiffness (S): Must be below 300 MPa at low temp — thermal cracking
  • BBR m-value: Must exceed 0.300 — stress relaxation rate
  • TestEquipmentAging StatePass Criteria
    G/sin δDSROriginal> 1.00 kPa
    G/sin δDSRRTFO> 2.20 kPa
    G·sin δDSRPAV< 5,000 kPa
    Creep stiffness SBBRPAV< 300 MPa
    m-valueBBRPAV> 0.300
    Flash pointCleveland Open CupOriginal> 230°C
    SolubilityTrichloroethyleneOriginal> 99.0%

Quality flags to watch in supplier COAs:

  • PG grading gap: Grades are spaced in 6°C increments; suppliers cannot claim "PG 67-24"
  • Modifier content: PG 76-22 requires minimum 3% SBS polymer by weight
  • Storage stability: Modified binders must show < 2.2°C separation after 48-hour storage test
  • Tank contamination: Neat and modified binder must never share transfer lines — cross-contamination alters grade by one full PG step

Market Pricing and Logistics for PG Bitumen

PG bitumen pricing tracks crude oil benchmarks with a 2–4 week lag. Brent at $80/bbl historically correlates to PG 64-22 at $500–$530/MT FOB Gulf Coast.

Pricing drivers:

  • Crude feedstock: 75% of binder cost
  • Polymer costs: SBS at $1,800–$2,200/MT drives modified grade premiums
  • Seasonality: Q2–Q3 peak paving season adds 3–7% to spot prices
  • Freight: Bulk tanker from Gulf Coast to West Africa: $60–$95/MT
  • Volume discounts: Orders above 5,000 MT typically earn $15–$30/MT reduction

Logistics lead times:

RouteMethodLead TimeTypical Volume
US Gulf → EuropeBulk tanker18–28 days5,000–25,000 MT
Middle East → South AsiaBulk tanker7–14 days10,000–30,000 MT
Singapore → AustraliaBulk tanker12–18 days5,000–15,000 MT
Refinery → job site (domestic)ISO tank / truck2–7 days20–30 MT

Packaging options and cost impact:

  • Bulk tanker: Lowest unit cost, $480–$560/MT for PG 64-22
  • ISO tanks (24 MT): Adds $25–$40/MT handling
  • Drums (185 kg): Adds $60–$90/MT — used only for remote sites
  • Bitutainers (flexitanks): Adds $35–$50/MT, suits small ports lacking tank infrastructure

FAQ: Bitumen Performance Grade (PG)

What does PG 64-22 mean in simple terms?

PG 64-22 means the bitumen resists rutting up to an average 7-day pavement temperature of 64°C and resists thermal cracking down to -22°C. The first number covers high-temperature performance, the second covers low-temperature performance. It is the default grade for most temperate-climate highway projects, priced around $480–$560 per metric ton FOB.

What is the difference between PG 64-22 and PG 70-22?

PG 70-22 handles pavement temperatures 6°C higher than PG 64-22, making it suitable for hot southern climates and heavy truck corridors above 10 million ESALs. It usually costs $20–$40 more per ton and often requires polymer modification to meet the higher rutting threshold. The low-temperature rating stays identical at -22°C.

How much does PG bitumen cost per ton in 2025?

Neat PG 64-22 ranges from $480–$560 per metric ton FOB depending on region, while polymer-modified PG 76-22 runs $620–$740 per metric ton. Prices move with crude oil, with roughly a 2–4 week lag behind Brent crude changes. Volume orders above 5,000 MT typically earn discounts of $15–$30/ton.

Can I substitute penetration grade 60/70 for PG 64-22?

Pen 60/70 is broadly comparable to PG 64-22 in stiffness but does not carry the same low-temperature guarantee. In projects specifying AASHTO M 320, substitution requires engineering approval and often additional testing. For critical infrastructure, always specify PG directly rather than converting from penetration grades.

What is the lead time for importing PG bitumen?

Bulk tanker shipments take 7–14 days on short routes (Middle East to South Asia) and 18–28 days on long routes (US Gulf to Europe). Add 5–10 days for inspection, documentation, and port clearance. Domestic ISO tank deliveries from refinery to job site typically complete in 2–7 days.

Optimize Your PG Bitumen Procurement with 6Tar

Every dollar per ton matters when you are moving 5,000–30,000 MT of PG bitumen per shipment, and a misjudged grade or freight route can erase your margin. Use the 6Tar cost calculator to model landed cost by PG grade, route, volume, and packaging format — including freight, insurance, and port charges — before you commit to a tender. Run your next PG 64-22 or PG 76-22 scenario in under 60 seconds and lock in the most competitive landed price.