Asphalt Project In Morocco

Last updated: 2026-10-17

AI-generated reference content for research only. Prices, volumes and figures are estimates; verify current market data and specifications before any trade.
本内容由 AI 生成,仅供研究参考。价格、产量等数据为估算值,交易前请核实最新行情与规格。

Asphalt Project In Morocco

An asphalt project in Morocco typically requires 800–1,200 tonnes of bitumen for a 20 km two-lane road, with bulk bitumen delivered at $480–$560 per tonne CIF Casablanca as of 2025. Standard Moroccan road construction follows NM 10.1.151 specifications, and project timelines usually range from 45 to 180 days depending on scope, terrain, and weather conditions. Morocco's National Road Authority (DNER) oversees most public asphalt works under the Programme Routier National, which targets over 1,500 km of new and rehabilitated roads annually.

Morocco's Road Infrastructure Market: Key Numbers

Morocco has invested heavily in road infrastructure over the past two decades, making it one of Africa's most active asphalt markets. The country's road network spans approximately 57,000 km, of which over 40,000 km are paved. The government's investment in transport infrastructure reached MAD 32 billion ($3.2 billion) in 2024, with roads accounting for a significant portion.

Indicator2022202320242025 (est.)
Paved road network (km)38,50039,80041,20042,500
Annual bitumen demand (tonnes)280,000310,000340,000365,000
Government road budget (MAD bn)24283235
New asphalt projects (public)180210240260
Average project size (km)8.59.210.110.8

Morocco imports nearly 100% of its bitumen, primarily from Spain, France, Italy, and increasingly from Middle East suppliers. This import dependency makes bitumen pricing a critical factor in project budgeting.

Bitumen Supply Chain for Asphalt Projects in Morocco

Understanding the supply chain is essential for anyone planning an asphalt project in Morocco. Bitumen reaches Moroccan projects through several channels:

  • Direct refinery imports – Bulk cargo from Repsol (Spain), TotalEnergies (France), and ENI (Italy) via the ports of Casablanca, Tangier Med, and Mohammedia
  • Trading companies – International bitumen traders supplying in drums (150–180 kg) or bulk (ISO tanks, flexitanks)
  • Local distributors – Moroccan companies that import and distribute bitumen to regional contractors
  • Bitumen emulsions and modified bitumen – Produced locally by companies like Bituma and Asment Temara for specialized applications
  • Supply RouteTypical Price (USD/tonne)Lead TimeMin. Order
    Bulk CIF Casablanca (Spain)$500–5407–14 days500 tonnes
    Bulk CIF Tangier Med (Italy)$510–55510–18 days1,000 tonnes
    Drummed (Middle East)$560–62020–30 days100 tonnes
    Bitumen emulsion (local)$650–7503–7 days20 tonnes
    Polymer modified (local)$800–9505–10 days10 tonnes

Key insight: Bulk shipments offer the best cost-per-tonne but require adequate storage capacity at or near the project site. For smaller asphalt projects under 5 km, drummed or emulsion bitumen is often more practical despite the higher unit cost.

Types of Asphalt Projects Active in Morocco (2025)

Morocco's asphalt sector covers a diverse range of project types, each with distinct bitumen requirements, specifications, and timelines.

Morocco's autoroute network is expanding under Plan Autoroutier 2030, which aims to add 1,000+ km of new highways. These projects demand high-grade penetration bitumen 50/70 or 35/50, along with polymer-modified bitumen for wearing courses.

  • Bitumen grade: Pen 35/50, Pen 50/70, PMB 40
  • Consumption per km (two-lane): 40–60 tonnes
  • Typical project duration: 120–365 days
  • Key contractors: TGCC, SGTM, Houar, Jet Contractors

The Programme Routier National (PRN) focuses on upgrading and rehabilitating existing roads. These projects use bitumen emulsions (60–65% residue) for surface treatments and Pen 60/70 for hot mix asphalt overlays.

Project TypeBitumen GradeTonnes per kmDuration
Autoroute (new)Pen 35/50, PMB90–120180–365 days
National road (new)Pen 50/7045–6590–180 days
Road rehabilitationPen 60/70, emulsion25–4030–90 days
Rural road (paved)Emulsion, Pen 60/7015–2520–60 days
Urban road/asphaltPen 60/70, PMB30–5030–90 days

Morocco's airport expansion program (including Casablanca Mohammed V and Marrakech Menara) and industrial zones (Tanger Med, Kenitra Atlantic Free Zone) require high-spec asphalt with PMB and hard-grade bitumen.

  • Bitumen grade: PMB 10/20, PMB 40, Pen 20/30
  • Consumption: 80–150 tonnes per 1,000 m²
  • Specifications: ICAO Annex 14, Moroccan NM standards

The Programme National des Routes Rurales (PNRR) has paved over 15,000 km of rural roads since 2005. These projects are smaller in scale but numerous, creating consistent demand for bitumen emulsion and Pen 60/70.

  • Average project size: 3–15 km
  • Bitumen per project: 50–300 tonnes
  • Funding: Government + World Bank + AfDB

Cost Breakdown: What an Asphalt Project in Morocco Actually Costs

Understanding the full cost structure helps project owners and contractors budget accurately. Below is a breakdown for a typical 20 km two-lane national road rehabilitation project in 2025.

Cost ComponentPercentage of TotalCost per km (USD)Total (USD)
Bitumen supply28–35%$18,000–24,000$400,000–480,000
Aggregates18–22%$12,000–15,000$260,000–300,000
Plant & equipment15–18%$10,000–12,500$220,000–250,000
Labor8–12%$5,500–8,000$110,000–160,000
Transport & logistics7–10%$4,800–6,800$96,000–136,000
Overheads & profit10–14%$6,800–9,600$136,000–192,000
Total100%$67,000–90,000$1.34M–1.8M

Bitumen is the single largest cost component, accounting for nearly one-third of total project costs. This makes procurement strategy critical—even a $20/tonne savings on bitumen can reduce total project cost by 2–3%.

PeriodAverage CIF Price (USD/t)Change
Q1 2023$465—
Q3 2023$510+9.7%
Q1 2024$525+2.9%
Q3 2024$495-5.7%
Q1 2025$520+5.1%
Q2 2025 (est.)$530–560+2–7%

Prices are influenced by crude oil benchmarks (Brent), shipping rates, and the EUR/USD exchange rate, as most European suppliers price in euros.

Logistics and Delivery: Getting Bitumen to Your Project Site

Morocco's geography and port infrastructure play a decisive role in bitumen logistics. Most bulk bitumen enters through:

  • Port of Casablanca – Morocco's largest commercial port; serves central and southern projects
  • Tanger Med – Serves northern projects and offers the shortest transit from Europe
  • Port of Mohammedia – Handles significant petroleum product imports
  • Port of Nador – Emerging as a supply point for eastern Morocco

For inland projects, bitumen is transferred from port storage to heated tankers (maintained at 140–160°C) and transported to project sites or asphalt mixing plants. Key considerations:

  • Heated storage tanks required at site or nearby (capacity: 50–500 tonnes)
  • Transport time from port should not exceed 8–12 hours to maintain temperature
  • Winter months (November–February) may cause delays in mountain regions (Atlas, Rif)
  • Summer months (June–August) allow extended paving windows but require temperature monitoring
  • RegionNearest PortTransport TimeTypical Freight (USD/t)
    Casablanca–SettatCasablanca1–3 hrs$15–25
    Marrakech–AgadirCasablanca4–8 hrs$30–50
    Tangier–TetouanTanger Med1–2 hrs$10–20
    Fez–OujdaNador/Casablanca5–10 hrs$35–60
    Laayoune–DakhlaCasablanca20–36 hrs$80–120

FAQ: Asphalt Projects in Morocco

Q1: How much bitumen is needed for a 1 km asphalt road in Morocco?

A standard 1 km two-lane road (7 m wide, 5 cm wearing course) requires approximately 40–50 tonnes of bitumen. For a full construction with base course, the total can reach 70–90 tonnes per km. Exact quantities depend on mix design, layer thickness, and aggregate absorption.

Q2: What is the current price of bitumen in Morocco?

Bulk bitumen CIF Casablanca ranges from $500–560 per tonne in 2025, depending on grade, supplier, and volume. Penetration grade 60/70 is typically at the lower end, while polymer-modified bitumen costs $800–950 per tonne. Drummed bitumen is $60–80 per tonne more expensive than bulk.

Q3: How long does an asphalt project take in Morocco?

A typical road rehabilitation project of 10–20 km takes 45–120 days, including mobilization, milling, paving, and compaction. New highway construction projects can take 12–36 months. Weather (rain in coastal areas, snow in mountain regions) significantly impacts timelines.

Q4: Which bitumen grades are used in Moroccan road projects?

Moroccan road specifications (NM 10.1.151) primarily use Penetration grades 35/50, 50/70, and 60/70 for hot mix asphalt. Polymer-modified bitumen (PMB 40 and PMB 10/20) is required for high-traffic autoroutes and wearing courses. Bitumen emulsions (60–65% residue) are used for surface treatments and tack coats.

Q5: How can I calculate the exact bitumen cost for my Morocco project?

To calculate precisely, you need: project length (km), width (m), layer thickness (cm), mix design (bitumen %), and current CIF price. Multiply total asphalt volume by bitumen content (typically 5–6.5% for wearing course) to get tonnage, then multiply by delivered price per tonne including freight to site.

Calculate Your Morocco Asphalt Project Cost Instantly

Planning an asphalt project in Morocco requires precise cost estimation—and bitumen is your biggest variable. Use the 6Tar cost calculator to get an instant, accurate estimate based on your project's specific parameters: road length, width, layer thickness, bitumen grade, and current market prices. Whether you're budgeting a 5 km rural road or a 50 km autoroute extension, 6Tar gives you the numbers you need to bid competitively and procure smartly. Try the 6Tar cost calculator today and take control of your bitumen budget.