Bitumen 80/100 2026

Last updated: 2026-10-17

AI-generated reference content for research only. Prices, volumes and figures are estimates; verify current market data and specifications before any trade.
本内容由 AI 生成,仅供研究参考。价格、产量等数据为估算值,交易前请核实最新行情与规格。

Bitumen 80/100 in 2026: Prices, Specs, and Export Guide

Bitumen 80/100 in 2026 trades at $340–$490 per metric ton FOB (bulk, Middle East origin), with penetration at 25°C between 80 and 100 dmm and softening point between 45°C and 52°C. Annual global demand for this grade is projected at 8.5–9.2 million metric tons in 2026, driven by highway and airfield construction in the Middle East, South Asia, and West Africa. Standard export volumes run in 20–30 MT flexitanks or 150–200 MT bulk vessel parcels, with delivery lead times of 7–21 days depending on port and incoterm.

What Is Bitumen 80/100? Specifications and Test Data

Bitumen 80/100 is a penetration-grade asphalt cement classified by needle penetration at 25°C under ASTM D5 / EN 1426. The "80/100" means penetration falls between 80 and 100 tenths of a millimeter (dmm) — a medium-soft grade suited to hot climates and moderate-traffic pavements.

PropertyTest MethodUnitSpec Range (80/100)
Penetration @ 25°CASTM D5 / EN 1426dmm80–100
Softening PointASTM D36 / EN 1427°C45–52
Ductility @ 25°CASTM D113cm100 min
Solubility (TCE)ASTM D2042%99.0 min
Flash Point (COC)ASTM D92°C225 min
Density @ 25°CASTM D70g/cm³1.01–1.06
Viscosity @ 135°CASTM D4402cSt280–420
Loss on HeatingASTM D1754%0.8 max
Penetration after TFOTASTM D5% of original50 min
GradePenetration (dmm)Softening Point (°C)Best UseTypical Price 2026 (USD/MT FOB)
40/5040–5052–60Heavy traffic, airports$395–$470
60/7060–7049–56Standard highways$365–$445
80/10080–10045–52Warm climates, medium traffic$340–$490
100/120100–12042–48Cold climates, light traffic$335–$420

Key point: 80/100 is softer than 60/70, so it performs better in hot ambient temperatures — it resists low-temperature cracking while remaining workable in pavements that see moderate axle loads.

Bitumen 80/100 Price Forecast for 2026

Pricing in 2026 depends on crude feedstock (Brent-linked), freight, and origin. The table below reflects bulk FOB ranges by region as of Q1 2026 estimates.

OriginPackingFOB Price (USD/MT)Lead TimeMin Order
Iran (Bandar Abbas)Bulk / Jumbo$340–$41010–18 days500 MT
UAE (Jebel Ali)Bulk / Drum$395–$4607–14 days200 MT
Iraq (Umm Qasr)Bulk$370–$43012–20 days1,000 MT
BahrainBulk / Flexitank$410–$4757–12 days100 MT
South KoreaDrum / Flexitank$430–$49018–30 days100 MT
  • Crude oil spread: A $10/bbl move in Brent shifts bitumen FOB by roughly $45–$60/MT.
  • Vessel availability: Bulk carrier tightness in the Arabian Gulf adds $15–$30/MT to freight.
  • Seasonality: Prices peak March–June (pre-monsoon road-building) and soften November–January.
  • Payment terms: LC at sight is standard; CAD or TT prepayment can shift pricing by 1–3%.

For a live estimate on your specific volume, lane, and incoterm, use the 6Tar cost calculator (linked at the end).

Packaging Options: Bulk, Drum, Flexitank, and Jumbo Bag

Choosing the right packing drives 10–25% of your landed cost. Here's how the options compare for 80/100 export in 2026.

PackingNet WeightCost Premium vs BulkBest ForHandling
Bulk (vessel tank)1,000–30,000 MTBaselineLarge road projectsPort-to-port only
New steel drum150–182 kg+$35–$55/MTSmall orders, inlandStandard pallets
Flexitank (20 ft)20–24 MT+$25–$40/MTContainer logisticsRequires heating at dest.
Jumbo bag (1 MT)1,000 kg+$30–$48/MTRemote sitesForklift
Polybag (40 kg)40 kg+$60–$90/MTRetail/roofingManual
  • 1,500 MT+ → bulk vessel is almost always cheapest.
  • 20–400 MT → flexitank in 20-ft containers (fastest to arrange).
  • Under 20 MT → drums or polybags, mainly for roofing and waterproofing buyers.
  • Hot climate destinations → confirm softening point before shipping 80/100, since it travels softer than 60/70.

Export Logistics and Delivery Timelines

For a standard 500 MT 80/100 order from the Middle East to a South Asian or West African port, plan on 21–35 days total from LC issuance to discharge.

  • Order confirmation to LC: 3–7 days
  • Production/allocation: 5–10 days
  • Inland haulage to port: 2–4 days
  • Loading & customs (origin): 2–5 days
  • Sea transit: 4–12 days (regional) or 18–30 days (long-haul)
  • Discharge & clearance: 3–7 days
  • Commercial invoice & packing list
  • Bill of Lading (original or telex release)
  • Certificate of Origin
  • Certificate of Analysis (ASTM/EN) — essential for 80/100 spec verification
  • MSDS
  • Inspection certificate (SGS/Intertek) — typically $1,200–$2,500 per lot
  • Heat losses in flexitanks increase discharge time by 4–8 hours.
  • Port congestion in West Africa can add 5–12 days.
  • Origin sanctions compliance — verify supplier banking channels before LC issuance.

2026 Market Demand by Region

Global consumption of 80/100 is concentrated where hot climates and medium-traffic roads dominate.

RegionEst. 2026 Demand (MT)Growth vs 2025Key Driver
South Asia2.4–2.7 million+4.5%National highway programs
Middle East1.8–2.1 million+3.8%Airports, urban roads
West Africa1.1–1.4 million+6.2%Infrastructure expansion
Southeast Asia0.9–1.2 million+5.0%Rural road upgrades
Latin America0.7–0.9 million+2.5%Maintenance backlog
Global total8.5–9.2 million+4.2%—

Takeaway: West Africa and South Asia show the fastest growth, making them priority destinations for 2026 export planning.

FAQ: Bitumen 80/100 2026

What is the price of bitumen 80/100 in 2026?

Bulk FOB prices range from $340–$490 per metric ton depending on origin, with Iranian cargo at the low end and South Korean drummed material at the high end. Add $25–$90/MT for drum, flexitank, or polybag packaging.

What is the difference between bitumen 60/70 and 80/100?

80/100 has a higher penetration (80–100 dmm vs 60–70 dmm) and a lower softening point, making it softer and better suited to hot climates and medium-traffic roads. 60/70 is harder and used for heavier traffic loads.

How many tons fit in a 20-ft container?

A standard 20-ft flexitank holds 20–24 metric tons of bitumen 80/100, depending on temperature at loading. A 40-ft container is not used for bulk bitumen because of weight limits.

What is the minimum order quantity for export?

Typical MOQs are 200 MT for bulk, 100 MT for flexitank, and 20 MT for drums. Smaller trial orders are sometimes accepted at a 5–10% price premium.

How long does shipping take in 2026?

Regional shipments (Middle East to South Asia) take 4–12 days at sea, while long-haul routes (Middle East to West Africa) run 18–30 days. Total lead time from LC issuance to discharge averages 21–35 days.

Get an Instant 2026 Quote — 6Tar Cost Calculator

Stop guessing at landed cost. The 6Tar cost calculator gives you a real-time 2026 estimate for bitumen 80/100 across origin, packing, volume, and destination port — including freight, inspection, and documentation.

  • Enter: volume, origin, destination, packing type
  • Get: FOB, CFR, CIF, and landed cost per MT
  • Compare: bulk vs drum vs flexitank in one view

Run your numbers now with the 6Tar cost calculator and lock your 2026 procurement budget with confidence.